Redesign of bridges of "Reconstruction of about 21 km road from Agarak to Vardanidzor; Construction of about 11 km road from Vardanidzor to tunnel exit (Trench 4)
Start date: 23-October-2023
Due date: 22-October-2026
Status: In progress
Technical area:
Transportation – Road, Bridges & Highways
Background
“North-South Road Corridor Investment Program” is a major infrastructure project (NSRCIP project) which aims at connecting the Southern border of Armenia with its Northern point by means of the 556 km-long Meghri-Yerevan-Bavra highway by reducing it to about 86 km and reaching up 470 km. This project consists of 6 Tranches.
Tranche no. 4 is the southern part of the North-South corridor and it consists of 3 main parts and 8 subsections in total. It begins from the town of Artashat and ends at the mutual border between the Republic of Armenia and the Islamic Republic of Iran.
Lot 1 of Tranche no. 4 (this contract) consists of the following parts:
-21 km (5km+16km) of road from Agarak to Vardanidzor (Section IV.3) and about 11 km of road from Vardanidzor to the tunnel exit